Today the plumbing and electrical started. Last Thursday we met with the electrician to go over where we wanted switches and outlets, what type of lights and their placement, where to run speaker wire and where to put the auxiliary 220V/60A switch panel. We also met the plumber and discussed different fixtures and placement of shower heads. In the end we decided to install 2 separate shower heads. One tall one for me and one shorter one for her that is also on a hose, for leg shaving. Finally, we met with the cabinet contractor to pick out our cabinets and look at counter top samples.